Build progress for my MHS based Obi-Wan V2 from Episode III.
When I first started on this build I had lots of open questions regarding how I was going to approach the activation box. I searched the forums for ideas and inspiration so I thought I would share my build progress so others might benefit.
Completed electronics chassis using parts from TCSS (PC 2.0, 14500, etc.)
Recharge port hidden behind the speaker and will be concealed in the pommel when closed.
Chassis is oriented in the main body section as shown below. The wires pointing upward feed into the activation box for the switches.
All the parts that comprise the activation box internals.
Slot cut into the side of the activation box. This was done by drilling a series of holes along the center line then squaring it out will considerable amounts of filing.
The switches are mounted to a board that is held in place with some wire wrapped around the mounting screw and attached to the board.
Switch activator required custom machining from plate aluminum and the generous help from a friend of mine who has a milling machine.
Hot glue was applied to the back of the switches to prevent shorting.
Here is how it looks inside.
Video of switch action.
http://s1279.photobucket.com/user/Ma...ce4a2.mp4.html
Here is how it looks with the chassis in place and wires all situated.
Activation box all complete.
Thanks for looking.
Bookmarks