The ETA on Tim's Graflex holders are 3 weeks so I wouldn't bother messing with the graflexshops holders. Corbin is working with them to make a 1" holder so they have better ones on the way but with Tim on the problem all you need to do is wait.[8D]

<center>
www.dewbackwing.com</center>