Not 100% sure this is the right place to post this but I have an ultrasabers aeon v4 stunt saber that I wanted to upgrade with a few Tcss parts, the hilt has a buckpuck and two 14500 batteries in 7.4v. it works well but I wanted to upgrade the battery, add a recharge port and maybe add a new pommel to hold the recharge port, but I’m not 100% sure I can do what I have planned, I cant see any reason I wouldn’t be able too but I wanted to check just to make sure I’m not missing something.

https://www.dropbox.com/s/od38sm4um3...reing.png?dl=0

so in the pic the first setup is how my ultra sabers is wired up, the plan is to snip off the battery pack at the connectors, buy a 7.4v 18650 battery pack with a quick connect, attach it to the recharge port with quick connect and then just connect the leads to the old positive and negative leads that used to connect the old battery pack, basically just replacing the old battery pack but with a recharge port spliced in between the battery and the rest of the saber. I was then thinking of using the tcss mhv1 style 4 pommel with recharge port insert. But looking though the description and pics wasn’t 100% sure it actually accepts an insert or not since the vents are already built in.

I also want to add in a tri-cree module to change the color but need to research more before I get to that. From my current understanding with a 7.4v battery pack and a 1000ma buck puck I can only drive 2 die on a tricree at full brightness in a stunt so id have to get a standard tricree and waste one die by only wiring up the two.

https://www.thecustomsabershop.com/P...ack-P1171.aspx
https://www.thecustomsabershop.com/M...Port-P877.aspx
https://www.thecustomsabershop.com/P...e-4-P1071.aspx