Results 1 to 4 of 4

Thread: My first Saber- Massacre

  1. #1

    Default My first Saber- Massacre

    hello all- this is my second post and i'd like to formally introduce myself and say hello and offer ym own small contribution to the forums - i wanted to post my first ever saber i built this past October- Massacre- a 12 inch 1 1/4 sinktube and 6 inch 1 1/2 inch sink tube- tcss bladeholder and heatsink and modular wiring system electronics

    100_0874.jpg

    100_0873.jpg
    Last edited by Gal-An Iabos; 07-25-2016 at 10:43 AM.

  2. #2

  3. #3

    Default

    Nice work. How does the 1 1/4 inch tube fit into the 1 1/2 tube? Any wiggle when you swing the blade?

  4. #4

    Default

    it's prett secure on there- i used a 12 inch 1 1/4 inch slip joint extension tube as the main tube and a 6 inch 1 1/2 inch outer tube. if you slide the larger but over the smaller one you can "clamp" them together with a cheap hole plug and the 1 1/12 inch slip joint and i use a clear polywasher to secure it up top and a black rubber polywasher for astetics
    Last edited by Gal-An Iabos; 08-04-2016 at 05:30 PM.

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •