I've already got a 4XAAA battery pack(I had it made a few weeks ago, when the shop still wasn't stocking them )

Main parts:

36" 1" Corbin show blade, double wrapped
blade holder #12 with heat sink
hilt style #4-I'm getting a box put in, should I get a standard style hole, or the guarded hole?
pommel #7
build your own seoul LED kit with green led and all other options standard.

services:
installation for box #9
drill and tap hole service. I know I need one of these for my covertec clip and one for my blade retention screw, correct? Which end do you guys prefer your covertecs on? I'm still undecided between putting it up top 1/4 of a turn or so away from my box or toward the pommel.

Screws/extra parts:
SPST Latching Guarded switch with silver button (I just prefer the look to the switch that comes with the build your own electronics kit.)
kill plug style 2(when it's back in stock)
2.1 mm jack
8/32 1/2" thumb screw
4-40 button head screw(for the activation box)
8/32" 1/4" socket head(for the covertec button)
covertec clip
machined covertec button
2 4-40 nylon screws(the shop's video showed that you need those to hold the LED in place, correct? Or should I go for the heat tape instead?)
1 foot of heat shrink
15 black o-rings(yeah, yeah, I know that some people hate the way they look, but I don't mind it, and would rather have more grip. I just wish the store was still selling the green ones too. Ah well.)

Did I miss anything there? Should I get some extra black and red wire to have some more room to solder? If so, which wire is that on the store?

Thank you for looking!