Silent_Jedi
06-22-2008, 01:30 PM
http://i14.photobucket.com/albums/a306/Pulse76/0622081602.jpg
It's still not complete yet. I used the original 616's aluminum tube as the inner structure, and it fits perfectly with the brass joint then slid a sink tube over the top. I prewired it up so it works, just have to wire in the battery pack after the JB weld dries (re-using the 616's battery pack). It's still plain, and I'm looking to add accents to it...preferibly brass or copper. I'm going to secure the top pipe with steel bolts and finishing washers and I'm going to add a blade retention screw.
any suggestions?
It's still not complete yet. I used the original 616's aluminum tube as the inner structure, and it fits perfectly with the brass joint then slid a sink tube over the top. I prewired it up so it works, just have to wire in the battery pack after the JB weld dries (re-using the 616's battery pack). It's still plain, and I'm looking to add accents to it...preferibly brass or copper. I'm going to secure the top pipe with steel bolts and finishing washers and I'm going to add a blade retention screw.
any suggestions?