View Full Version : Machine shilt fee?
runner4life
01-15-2010, 08:12 PM
What is it?
Lord Maul
01-15-2010, 08:16 PM
Email Tim. Custom machining is done on an as-requested basis.
runner4life
01-15-2010, 08:19 PM
But i havent asked for anything.
He said hes done my order this is wat it looked like...Hes just waiting to ship it
1 1/8Adhesive 1/8" Adhesive lined heatshrink tubing $0.80
1 8-32Vthumb 8-32 x 1/2" thumb screw $3.70
1 sledholder18 Screw on LED blade holder style 18 $24.85
1 MPSI6 MPS Insert style 6 $5.10
1 Qconnector 2 Wire quick connector $0.45
1 MPS7 MPS Pommel style 7 $6.00
1 SeoulP4Kit Build Your Own Seoul P4 Electronics Kit $18.21
* 4AAA battery holder
* Seoul P4 (Green)
* Collimator Lens 5° viewing angle
* 3.3ohm 5w resistor
* Push on/push off switch with black button
* Luxeon III/V Lens Holder
1 Corb1Show LED "Corbin style" Show blade 1" OD (36 inches) $34.99
* ** Quad Wrap
* ** Standard
1 MHSRibbed MHS ribbed extension $19.50
1 PowderCoat Powder Coating (Super Wet Black, RIB3) $17.50
1 Shilt3S Hilt style 3 with standard style switch hole $0.00
1 Shilt fee ** Machine Shilt Fee $7.00
1 Shilt1 ** Hilt style 1 with standard style switch hole $23.00
1 SHIPPING USPS Priority Mail International $41.05
Lord Maul
01-15-2010, 08:21 PM
OH, you already ordered. The machining fee is because you asked for the piece to be powdercoated and then have some PC removed to show the metal underneath.
runner4life
01-15-2010, 08:23 PM
Oh right thankyou. And what is with the two hilts?
Lord Maul
01-15-2010, 08:33 PM
They are all the same part, just with a specification for the switch hole style, PC work, and the part itself.
runner4life
01-15-2010, 08:49 PM
oh i think i get it...So basically hilt 3 is hilt 1 with machine grooves?
im really sorry im slow. im used to building sabers with wood.
Jay-gon Jinn
01-15-2010, 10:36 PM
The pc charge for machining the hilt is included in the $17.50 for the price of the pc....Tim only charges $5.00 extra to re-machine the hilt after pc'ing is done, and pc'ing a part is $12.00.
The extra $7 is from taking a plain MHS hilt piece (Shilt1) and machining it into a hilt 3, with the "S" meaning standard switch hole.
runner4life
01-15-2010, 11:08 PM
great :)
thanks for your reply. Got it now
Skottsaber
01-15-2010, 11:18 PM
That sounds like a cool hilt! Give us some pics once you're done! :)
runner4life
01-15-2010, 11:52 PM
yeah i will for sure...might take me a while being so retarded as i am :P.
ill get there. plus im very busy with work n study.
It will look like this. http://i857.photobucket.com/albums/ab138/run4life_photo/SaberBuilder_render.png
Im not sure if it will turn out well with so many ribbed kind of features. I might cover some of it up a pvc overlay i already had from a botched job several years ago.
DJMoonbass
01-22-2010, 10:00 PM
very nice!
Powered by vBulletin® Version 4.2.3 Copyright © 2024 vBulletin Solutions, Inc. All rights reserved.